Erwin Pesch and Ulrich A.W. Tetzlaff
Key words:
personnel planning, branch-and-bound, resource levelling
Mathematices Subject Classification: 90C57
ONLINE SUBSCRIPTION (Institutional Subscription Only)
Copyright© 2005 Yokohama Publishers
Back

Abstract:
For the case of a personnel planning situation for a very large car manufacturer, this paper investigates the interaction between management decisions and scheduling. In particular, we consider the manufacturing of car bodies or pieces of them within a press machine shop and propose an efficient procedure to overcome deficiencies in manpower planning and in-time production. The presented model allows to minimize the maximum number of workers required per time unit. We propose an optimal as well as a heuristic algorithm based upon a branch-and-bound procedure.
Scheduling personnel for press machines in the automotive industry

Special Issue in Honor of the 65th Birthday of Toshihide Ibaraki
Volume 1, Number 3, September 2005, pp. 545-564